Showing posts with label [TPE]. Show all posts
Showing posts with label [TPE]. Show all posts

Wednesday, October 8, 2008

Trans-Pacific Express (2)

The first phase of TPE (Trans Pacific Express) cable is just ready for service!

Some updates (see the other older post) :
  • "Originally announced as a 5.12 terabit system in December 2006, the cable system has increased in capacity, and when fully deployed when phase two is completed, TPE will be a 6 terabit submarine cable system" (Submarine Cable News); 6.4 Tbps I guess
  • Suppliers: Tyco (prime); ASN; NEC
  • "With the addition of NTT Communications, the TPE cable system will add a submarine cable link to Japan giving the TPE cable system six landing sites"
  • "The operating capacity of the system is 3.2 Tbps, an increase of 25 percent over the original system design. With a minimum 80 wavelengths per fiber, TPE has the highest wave-density of any submarine cable in the world at this length."
AT&T (Submarine Cable News)

“We are excited that the first phase of the Trans-Pacific Express is complete and ready for our customers’ use,” said Kaveh Hushyar, senior vice president of network planning and engineering for AT&T. “AT&T today carries more than 15.8 petabytes of IP and data traffic on an average business day, and this traffic volume is growing at more than 50 percent year over year. Our participation in the TPE network helps to ensure that we’re continually staying several steps ahead of our customers’ ever-growing global communications needs.”

AT&T owns or leases capacity on more than 80 submarine cable systems, which span more than 478,000 fiber-route miles (approx. 760,000 km) around the globe, including several submarine cable routes that the company uses to carry traffic between the Asia-Pacific region and North America.
Verizon
Verizon Business multinational customers with IP, data and voice communications traffic moving onto this cable system, which is now active, will see immediate benefits including additional capacity, greater physical diversity, reduced latency, improved performance and seven-way mesh network diversity, the company said in a statement.
In addition to the physical diversity of the TPE submarine cable route, customers also will take advantage of a network architecture design called meshing, which provides alternate paths for rerouting traffic in the event of a cable cut or network disruption. When a service interruption occurs and meshing is needed, the equipment housed in network buildings on land allows the rerouting of voice and data traffic within 50 to 100 milliseconds. (Finally, a commercial submarine mesh restoration, Cool!)

As a leader in global mesh networks, Verizon Business is the first to offer seven-way trans-oceanic mesh diversity across both the Pacific and Atlantic oceans. The company’s mesh network in northern Asia includes physical node diversity in major cities, coupled with backhaul and cable system diversity to provide superior survivability during network issues. Mesh nodes were recently installed in Hong Kong, South Korea and Taiwan. Japan was already included in the Pacific global mesh network.

“When you combine the complete TPE package we are offering our Verizon Business multinational customers, it’s second to none in the industry”
TPE Route (Courtesy TPE Consortium? ; Taken from Tata/Byron Clatterbuck)

Saturday, August 23, 2008

Trans-Pacific Express (TPE) Cable System

TPE (Trans-Pacific Express) is claimed to be "the first next-generation undersea optical cable system directly linking the US and China" and "the first major undersea system to land on the US West Coast in more than seven years". TPE will have a more than 60 times the overall capacity of the existing cable directly linking the US and China, and thus it will be a major enhancement to the current cable systems between these nations.

TPE links China (Chongming and Qingdao), South Korea, Taiwan, and USA (Nedonna Beach). TPE is owned by a joint venture (ownership is evently split) between 6 telcos: China Telecom, China Netcom, China Unicom, Chunghwa Telecom, Korea Telecom, Verizon Communications, AT&T and NTT (the two latest joined in 03/2008).
  • Consortium agreement: early 2007 ?
  • CAPEX : USD 500 mn
  • Length : approx. 17,700 km (11,000 miles)
  • RFS : August (Q3) 2008 ??
  • Capacity : 5.12 Tbps design, 1.28 Tbps initial (other source 2.56 Tbps); 10 Gbps channel; FP? Lambdas?; customers may utilize individual connections running at 10 Gbps
If TPE and AAG are completed, AT&T shall be the first large company having capacity on both systems. And if they have connections from China/Taiwan to Phillipines/Guam they may offer survivable transpacific connection services earlier than PACNET EAC-Pacific. True??

Source/Courtesy TPE Consortium?, taken from Wikipedia

Soft-Brain is now Harewos.Telecom !

Please visit my new 'home' : Harewos.Telecom

Google It!

Creative Commons License. August 2008