DMCS

Dumai Melaka Cable System (DMCS) is owned jointly by PT. Telkom and Telekom Malaysia. This was the second submarine cable project of PT. Telkom after the TIS (Thailand Indonesia Singapore) cable.
  • Length approx. 160 km
  • Contractor : NEC Corp.
  • Capacity : design 320 Gbps, initial 20 Gbps protected (10 Gbps channels, 16 Lambdas, 2 FP)
  • Unrepeatered system
  • CAPEX : USD 9.3 - 11 mio.
  • Construction: 06/2004 - 12/2004, official RfS 17/02/2005