Jakasusi (JAva KAlimantan SUlaweSI) :
- Jakasusi segment 1 (B1) connects Banyu Urip (Jawa Timur) to Takesung (Kalimantan Selatan)
- Jakasusi segment 2 (B2) connects Takesung (Kalsel) to Aeng Batu Batu (Sulawesi Selatan)
- Length 1,000 km
- CAPEX USD 40 mio.
- Construction period : March 2006 - October 2006
- Contractor : Alcatel (ASN)
- Subcontractors :EGS Asia Ltd (route survey, burial assessment survey - February 2006)
- Capacity : ?
- CAPEX: USD 6 mio.
- Contractor : Alcatel (ASN)
- System : (shall be) unrepeatered
- Capacity : ?
- Construction period : 2006 ?
- Familly/system : repeatered
- Contractor : Alcatel (ASN)
- Capacity : 5 Gbps / 1 FP
- Length (km) : 730
- Number of repeaters : 7
- Service date : 1996
Anybody knows JATISEMARAK ?
No comments:
Post a Comment